OnAugust 18oflocal time , the first low-voltagedistribution transformerzone(PT87)was charged to home-entry electricity connecting in Cacuaco area of electrification and household connecting project in Luanda of Angola which was built by Sinhohydro Bureau No. 4 Engineering Co.,Ltd. The folk music reverberation and thunderous applause were filled with the construction site which was really bustling.
The 1000 low-voltagedistributiontransformer zones were referred Luanda province subordinate 8 administrative regions (cacuaco,viana,cazanga ,belas,kilamba kiaxi,talatona,luanda,bengo).The whole home-entry electricity connecting finished would benefit three hundred thousand local residents including 292transformer zones of Cacuaco and 325 household of home-entry electrification this time.
This transformer zone for home-entry electrification was made the 325 household of Cacuaco say goodbye to darkness in advance and enjoy the brightness from the electricity.It was reported that we would greatly optimizethe urban power supply structure ofLuanda, promotethe level of municipal public service,lead the urban development,improve the regional power supply environment,promote electricity planning and construction along the line and take an effective way in promoting to economic and social development for Luanda province after this project was completed.
Copyright ? 2013 by Sinohydro Bureau NO.4 Co.,Ltd. All Rights Reserved