"

千亿体育app下载拥有全球最顶尖的原生APP,每天为您提供千场精彩体育赛事,千亿体育app下载更有真人、彩票、电子老虎机、真人电子竞技游戏等多种娱乐方式选择,千亿体育app下载让您尽享娱乐、赛事投注等,且无后顾之忧!

<cite id="3xz5p"></cite>
<var id="3xz5p"><video id="3xz5p"></video></var>
<cite id="3xz5p"></cite>
<cite id="3xz5p"><noframes id="3xz5p"><var id="3xz5p"></var>
<cite id="3xz5p"></cite>
<var id="3xz5p"></var>
<cite id="3xz5p"><noframes id="3xz5p"><menuitem id="3xz5p"></menuitem>
<cite id="3xz5p"><span id="3xz5p"><var id="3xz5p"></var></span></cite>
"

 

Jinsha River Jin’anqiao Hydropower Station
Time:2013-10-11 13:04:27        Word size: Small Middle Large

Project overview:Rolled compacted concrete gravity dam, the maximum height of the dam is 160 meters, total installed capacity is 2.4 million kilowatts, the storage capacity is 847 million cubic meters. The project is the first project launched by hydropower development at middle reaches of the Jinsha River.

 

Undertaken project:No.1, No.2 diversion tunnels downstream sections works, excavation and support of slope at left bank; cable machine platform treatment and reinforced support works at left bank ,civil works of main dam and manufacture and installation of metal structure works.

 

 

 

Copyright ? 2013 by Sinohydro Bureau NO.4 Co.,Ltd. All Rights Reserved

<cite id="3xz5p"></cite>
<var id="3xz5p"><video id="3xz5p"></video></var>
<cite id="3xz5p"></cite>
<cite id="3xz5p"><noframes id="3xz5p"><var id="3xz5p"></var>
<cite id="3xz5p"></cite>
<var id="3xz5p"></var>
<cite id="3xz5p"><noframes id="3xz5p"><menuitem id="3xz5p"></menuitem>
<cite id="3xz5p"><span id="3xz5p"><var id="3xz5p"></var></span></cite>