"

千亿体育app下载拥有全球最顶尖的原生APP,每天为您提供千场精彩体育赛事,千亿体育app下载更有真人、彩票、电子老虎机、真人电子竞技游戏等多种娱乐方式选择,千亿体育app下载让您尽享娱乐、赛事投注等,且无后顾之忧!

<cite id="3xz5p"></cite>
<var id="3xz5p"><video id="3xz5p"></video></var>
<cite id="3xz5p"></cite>
<cite id="3xz5p"><noframes id="3xz5p"><var id="3xz5p"></var>
<cite id="3xz5p"></cite>
<var id="3xz5p"></var>
<cite id="3xz5p"><noframes id="3xz5p"><menuitem id="3xz5p"></menuitem>
<cite id="3xz5p"><span id="3xz5p"><var id="3xz5p"></var></span></cite>
"

 

Jinsha River Xiluodu Hydropower Station
Time:2013-10-11 12:56:45        Word size: Small Middle Large
 

Project overview:concrete hyperbolic arch dam, the maximum height of the dam is 278 meters, total installed capacity is 12.6 million kilowatts, storage capacity is 12.67 billion cubic meters. The project is currently second largest hydropower station in China.

Undertaken project:Cleaning works of dangerous rocks and covering layer at outlets of diversion tunnels and flood discharging tunnel at left bank, construction and support works of diversion tunnel, excavation works at inlet of diversion tunnel, tailrace surge access tunnel work at the left bank, plunge pool, afterby dam work.

 

Copyright ? 2013 by Sinohydro Bureau NO.4 Co.,Ltd. All Rights Reserved

<cite id="3xz5p"></cite>
<var id="3xz5p"><video id="3xz5p"></video></var>
<cite id="3xz5p"></cite>
<cite id="3xz5p"><noframes id="3xz5p"><var id="3xz5p"></var>
<cite id="3xz5p"></cite>
<var id="3xz5p"></var>
<cite id="3xz5p"><noframes id="3xz5p"><menuitem id="3xz5p"></menuitem>
<cite id="3xz5p"><span id="3xz5p"><var id="3xz5p"></var></span></cite>