1. Project Overview:Concrete gravity dam, the height of the dam is 161 meters,total installedcapacity is 6 million kilowatts, the total storage capacity is 5.163 billion cubic meters. The project is the hydropower station at the end of the Jinsha River.
Undertaken project:Phase one project of the concrete production system at the right bank, Phase two civil work and manufacture and installation of metal structure of the main body.
Copyright ? 2013 by Sinohydro Bureau NO.4 Co.,Ltd. All Rights Reserved