"

千亿体育app下载拥有全球最顶尖的原生APP,每天为您提供千场精彩体育赛事,千亿体育app下载更有真人、彩票、电子老虎机、真人电子竞技游戏等多种娱乐方式选择,千亿体育app下载让您尽享娱乐、赛事投注等,且无后顾之忧!

<cite id="3xz5p"></cite>
<var id="3xz5p"><video id="3xz5p"></video></var>
<cite id="3xz5p"></cite>
<cite id="3xz5p"><noframes id="3xz5p"><var id="3xz5p"></var>
<cite id="3xz5p"></cite>
<var id="3xz5p"></var>
<cite id="3xz5p"><noframes id="3xz5p"><menuitem id="3xz5p"></menuitem>
<cite id="3xz5p"><span id="3xz5p"><var id="3xz5p"></var></span></cite>
"

 

Yellow River Wanjiazhai Hydro-Junction Project
Time:2013-10-08 20:47:35        Word size: Small Middle Large

 

Project Overview:Gravitational concrete dam: its maximum height and total generating capacity are 105m and 1.08 million kilowatts respectively. Its reservoir capacity stands at 896 million cubic meters. This hydropower station is the first cascade hydropower station across the the north trunk stream of the Yellow River and won the “China’s Quality Project Prize” issued by China Water Engineering Association in 2005.

Construction period:Main works of this project was commenced in October 1994. Its first generation unit was put into operation in November 1998. The project was completed in September 2002.

Undertaken Project:Some front-end projects, main body construction, and installation of three generation units.

Copyright ? 2013 by Sinohydro Bureau NO.4 Co.,Ltd. All Rights Reserved

<cite id="3xz5p"></cite>
<var id="3xz5p"><video id="3xz5p"></video></var>
<cite id="3xz5p"></cite>
<cite id="3xz5p"><noframes id="3xz5p"><var id="3xz5p"></var>
<cite id="3xz5p"></cite>
<var id="3xz5p"></var>
<cite id="3xz5p"><noframes id="3xz5p"><menuitem id="3xz5p"></menuitem>
<cite id="3xz5p"><span id="3xz5p"><var id="3xz5p"></var></span></cite>