"

千亿体育app下载拥有全球最顶尖的原生APP,每天为您提供千场精彩体育赛事,千亿体育app下载更有真人、彩票、电子老虎机、真人电子竞技游戏等多种娱乐方式选择,千亿体育app下载让您尽享娱乐、赛事投注等,且无后顾之忧!

<cite id="3xz5p"></cite>
<var id="3xz5p"><video id="3xz5p"></video></var>
<cite id="3xz5p"></cite>
<cite id="3xz5p"><noframes id="3xz5p"><var id="3xz5p"></var>
<cite id="3xz5p"></cite>
<var id="3xz5p"></var>
<cite id="3xz5p"><noframes id="3xz5p"><menuitem id="3xz5p"></menuitem>
<cite id="3xz5p"><span id="3xz5p"><var id="3xz5p"></var></span></cite>
"

 

Yellow River Gongboxia Hydropower Station
Time:2013-10-08 20:45:15        Word size: Small Middle Large

 

Project Overview:Concrete –faced rock –fill dam: Its maximum height and total generating capacity are 139m and 1.5 million kilowatts respectively. Its reservoir capacity stands at 620 million cubic meters. It won the “Luban Prize” in 2007, the highest honor in building industry of our country. In 2009 got “Zhan Tianyou Award” and selected as top 100 classical construction projects of China.

Construction period:This project was commenced in August 2001, Its first generation unit was put into operation in September 24,2004. The project was completed in 2006.

Undertaken project:Diversion tunnel project of CIbid package, concrete faced rock-fill dam project of CIIbide package, project of diversion tunnel, water inlet and penstock of CIVbid package, right –bank swirling spillway tunnel project of CVIIbid package, GIS switch station project, right –bank drain adit project, operation and management of concrete mixing system and installation construction of mechanical and electrical equipment.

Copyright ? 2013 by Sinohydro Bureau NO.4 Co.,Ltd. All Rights Reserved

<cite id="3xz5p"></cite>
<var id="3xz5p"><video id="3xz5p"></video></var>
<cite id="3xz5p"></cite>
<cite id="3xz5p"><noframes id="3xz5p"><var id="3xz5p"></var>
<cite id="3xz5p"></cite>
<var id="3xz5p"></var>
<cite id="3xz5p"><noframes id="3xz5p"><menuitem id="3xz5p"></menuitem>
<cite id="3xz5p"><span id="3xz5p"><var id="3xz5p"></var></span></cite>