"

千亿体育app下载拥有全球最顶尖的原生APP,每天为您提供千场精彩体育赛事,千亿体育app下载更有真人、彩票、电子老虎机、真人电子竞技游戏等多种娱乐方式选择,千亿体育app下载让您尽享娱乐、赛事投注等,且无后顾之忧!

<cite id="3xz5p"></cite>
<var id="3xz5p"><video id="3xz5p"></video></var>
<cite id="3xz5p"></cite>
<cite id="3xz5p"><noframes id="3xz5p"><var id="3xz5p"></var>
<cite id="3xz5p"></cite>
<var id="3xz5p"></var>
<cite id="3xz5p"><noframes id="3xz5p"><menuitem id="3xz5p"></menuitem>
<cite id="3xz5p"><span id="3xz5p"><var id="3xz5p"></var></span></cite>
"

 

Lancang River Xiaowan Hydropower Station
Time:2013-10-08 20:44:09        Word size: Small Middle Large

 

     

      Project overview: Double arch dam, Its maximum height is 294.5m. It is the first 300 level double arch dam with the total generation capacity of 4.2million kilowatts. Its reservoir capacity stands at 14.9 billion cubic meters. It’s a symbolic project of national western development and the and the strategy of “ West- East electricity transmission project”

Construction period:The project was commenced in January 2002. Its first generation Unit was put into operation in September 25, 2009. The project was completed at the end of 2010.

Undertaken project:700m slope excavation, civil engineering of the dam, production and installation of metallic structure, production and transportation of concrete.

Copyright ? 2013 by Sinohydro Bureau NO.4 Co.,Ltd. All Rights Reserved

<cite id="3xz5p"></cite>
<var id="3xz5p"><video id="3xz5p"></video></var>
<cite id="3xz5p"></cite>
<cite id="3xz5p"><noframes id="3xz5p"><var id="3xz5p"></var>
<cite id="3xz5p"></cite>
<var id="3xz5p"></var>
<cite id="3xz5p"><noframes id="3xz5p"><menuitem id="3xz5p"></menuitem>
<cite id="3xz5p"><span id="3xz5p"><var id="3xz5p"></var></span></cite>